01Standard Installation Method

Standard Installation Method
Based on our years of experience and achievements, we ensure construction within a set construction period by paying careful attention to process control based on the operation and shutdown conditions of facilities, with safety as the first priority.
We are committed to customer satisfaction.

02Lifting method

Lifting method

Shorten the shutdown period of cooling towers

The lifting method is the best for replacing existing cooling towers in a short period of time when existing facilities cannot be idle for long periods of time.
We are flexible to customer's situation.

Procedure of lifting method

Back to Products and Service